欧美人与动牲交欧美精品,久久久久久久无码中文字幕爆,免费无遮挡无码永久在线观看视频,特级丰满少妇一级AAAA爱毛片,玩弄人妻少妇500系列视频

News

Home > News > Company News

Huanding's self-developed tractor successfully transported perforation guns in Southwest oil and gas fields

Source:Huanding Energy Services    Time:2024/11/8 15:09:55    Views:68

RecentlyHuanding's self-developed tractor successfully transported perforation guns in Southwest oil and gas fields.

The construction information is as follows:

YS*****-2 well summary of tractor conveying perforating guns


BASIC BACKGROUND

1,involved companies

Wireline providerchina petrol group logging company southwest perforation branch

Tractor serviceHuanding Energy Services

Operation crewC3716

2, well condition

Well  nameYS**

locationtaikang village, yingshan county, luzhou city, sichuan province

Well type production

Well fluidwater

Well depth3540 meter

Casing programme140mm*3540m

Max inclination87.23°

Kick off point1500m

TD temp80℃

3, logging programme

interval0-3540m

Job typeperforation

4, equipment

Wireline loggingCPL perf string

Conveyance toolSTRACTOR tractor

Operation recording

1complete tool stringtop adaptor+swivel sub+mono-to-multiple converter+CCL+tractor electronicEC1701-1+centralizerHD1701-1-2+hydraulic controlling sectionEBS1701-1+driving wheel module No.1DS1701-1-1+driving wheel module No.2 DS1701-1-2+driving module No.3DS1701-1-3+pressure compensation subCS1701+voltage prevent module+ flex sub+mechanical shock absorber+bottom crossover

specification

Total length12.5m

Max OD80mm

Max tension4T

Max compression4T

Max pressure140MPa

2) Operation procedure

   The well depth 3540m,kick off point 1500m,max inclination 87.23°,according to requirement of client, tractor shall convey whole perforating string to TD, then firing five times,estimated tractoring interval is 1500m.

     2024-11-4 date crew arrives well at 16:30,

11:16 am run in hole,

14:00 pm stops at 1921mstart tractor;

17:49 pm reaches 3490mswitch to perforation mode

18:00 pm first firing,18:50 final firing

Tractor recording

time

14:00

16:05

17:01

17:49

depth

1921m

2747m

3165m

3490m

Applied tool pressure

6.5MPa

6.5MPa

7MPa

7MPa

Wheel rotation

3240ss

3240ss

3240ss

2200ss

Applied voltage

480V DC

480V DC

480V DC

480V DC

Applied current

1.0-1.2A

0.7-0.9A

1.4-1.6A

2.3A

欧美人与动牲交欧美精品,久久久久久久无码中文字幕爆,免费无遮挡无码永久在线观看视频,特级丰满少妇一级AAAA爱毛片,玩弄人妻少妇500系列视频